| The Bavaria arrived in the port on September 4, 2001. | ||||
|
The Bavaria carried 41 pieces of equipment destined for an oil extraction construction project in northern Alberta, Canada. |
||||
![]() |
||||
|
The largest piece, a flue gas stack section, was 72 feet long. The total shipment weighed over 250 metric tons. The equipment was picked up in Alexandria, Egypt, where it was also manufactured. |
||||
![]() |
||||
| Last year, the Stellanova and the Fairlift also brought equipment for the same project in Alberta. | ||||
|
|
||||
|
||||