The BBC Jade arrived
Duluth on September 8th, 2011 with wind turbine parts loaded in Denmark. .
The BBC Jade arrived in Duluth on September 8,
2011 with a cargo of wind turbine parts..Loaded in Aarhus, Denmark by
Siemens Wind Power, the shipment included 15 nacelles, 16 power units, 15
radiators and 160 containers.