The BBC Oregon arrived on April 24, 2011 to discharge wind turbine parts loaded in Aarhus, Denmark.


Above, 'Big Red' was used to transport wind turbine pieces from the BBC Oregon to a laydown area. The ship arrived on Sunday, April 24th with wind turbines parts loaded for Siemens in Aarhus, Denmark. They will eventually be moved by rail to a wind farm near Adair, Iowa.