The BBC Rhine arrived off the Duluth piers in late
August, 2010. She dropped anchor while she waited for the dock at Lake
Superior Warehousing to open. She came in on September 2nd and began
discharging wind turbine tower base units she loaded in Aarhus, Denmark. The
wind turbine parts will be shipped to a wind farm in Manitoba. This was her
first trip to the Duluth Superior port.

