The Beluga Frequency arrived October 15, 2010
A large generator built for Alstom Power in Poland and destined for Basin Electric Power Cooperative in Brookings, South Dakota was discharged from the Beluga Frequency on Sunday, October 17, 2010. Above, it is slowly guided into position on a special 16-axle rail car from Kasgro. Below and right, a large piece was discharged onto a Perkins Motor Transport (Northfield, Minnesota) trailer on Saturday.Beluga Frequency at Lake Superior Warehousing