The Stellanova was here in October with the first load of heavy equipment built for
an oil extraction construction project in northern Alberta, Canada.
The Fairlift brought the last 136 pieces to Duluth in December.
Built in Kobe, Japan, seven of the pieces weighed over 500 tons. |
 |
Most of the
cargo, and all of the heavier pieces, was discharged from the Fairlift onto sixteen special 12-axle railcars that were brought to Duluth
for this project. The remainder of the shipment was taken off the Fairlift and placed on trucks for over-the-road shipment to
Alberta. |
 |
Operated
by Jumbo Shipping (Kahn Scheepvaart), Rotterdam, Holland, the Fairlift is only 329 feet (100 meters) long. Like the Stellanova, she
is outfitted with deck cranes capable of handling heavy loads. |

|
 |
 |
for
more information, contact:
Lake Superior Warehousing Co., Inc
|
|
Jonathan
Lamb, Vice President, Operations
jonathan.lamb@lswci.com
Jason Paulson, Operations Manager
jason.paulson@lswci.com
Denise
McDougall, Warehouse Coordinator
Denise.McDougall@lswci.com
Ruth
Delich, Office Assistant
Ruth.Delich@lswci.com
Brian
Granholm, Jr., Logistics Coordinator
Brian.Granholm@lswci.com
1210
Port Terminal Drive
Duluth, Mn 55802
(218) 727-6646
Fax: (218) 727-6649
©
2008 Lake Superior Warehousing Co., Inc.
|
|
|