The Ostkap arrived in the port on June 20, 2005 to discharge parts for wind turbines.

Below, the 2nd of 18 nacelle's is discharged. A nacelle is the enclosure for much of the machinery needed to operate the wind turbine.

Each nacelle weighs 113,427 pounds.
 
 
 
The shipment also included 18 wind turbine hubs. The first one discharged can be seen in the photo below, wrapped in blue plastic.
 
 
for more information, contact:
Lake Superior Warehousing Co., Inc

Jonathan Lamb, Vice President, Operations
jonathan.lamb@lswci.com

Jason Paulson, Operations Manager
jason.paulson@lswci.com

Denise McDougall, Warehouse Coordinator
Denise.McDougall@lswci.com

Ruth Delich, Office Assistant
Ruth.Delich@lswci.com

Brian Granholm, Jr., Logistics Coordinator
Brian.Granholm@lswci.com

1210 Port Terminal Drive
Duluth, Mn 55802
(218) 727-6646
Fax: (218) 727-6649

© 2008 Lake Superior Warehousing Co., Inc.
dsnsmsmwithtext.gif (1957 bytes)