The Sunflower arrived October 12,
2010 to discharge 24 wind turbine nacelles
Lake
Superior Warehousing Co., Inc.
1210 Port Terminal Drive
Duluth, Mn 55802
(218) 727-6646
Fax: (218) 727-6649
On October 12. 2010, 24 nacelles, loaded into the
Sunflower E in the port of Vigo, Spain, were discharged at the Warehouse.
This is the first one to be taken off. They will eventually go Chandler,
Minnesota.